Project Planning
- Preconstruction budget and schedule review
- Permitting, inspections and owner reviews tracked to closeout
- Specialty trade partners scheduled, coordinated and supervised by our superintendent
- Closeout records, warranties and as-built drawings delivered with the building
A good food plant is built around what happens to a drop of water. Water carries product through the process, washes it away at the end of a shift and, if the floor is wrong, sits in a low spot and becomes a quality problem. In New Mexico the same water has to arrive through desert utilities and leave through a wastewater system that may be limited, so we start every food project by following the water.
The state has a diverse base of processors. Roswell is home to one of the world's largest mozzarella factories, Portales has about 40 dairies and a major dairy solids plant, and Ready Roast Nut Company bought the 70-acre Portales Peanut Plant in 2015, with a 53,000-square-foot shelling facility and storage for about 28 million pounds of farmer stock peanuts. In Lovington, Big Dog Industries bought a former 90,000-square-foot cheese plant in 2020 with more than $15 million of planned investment.
These businesses share a need for buildings that are easy to clean, safe for workers and flexible enough for the next product line. We build both new plants and additions, and we are comfortable working alongside production teams who cannot stop the line.
Processing Country
Eastern New Mexico is the center of the state's dairy and agricultural processing. Irrigated farming, dairying, ranching and petroleum-related facilities share the Roswell area, and Clovis lists Southwest Cheese among its major employers with 440 workers. Rail connections through BNSF help move finished goods out of the region.
These conditions create demand for plants that can scale. We listen to owners about volumes, seasonality and expansion, and then size utilities, wastewater and loading docks so the plant can grow without being torn apart. For owners in the area, our knowledge of Portales and Lovington helps us plan realistic site and permit paths.
Hygienic Building Elements
A food plant has many details that an ordinary warehouse does not. Walls and ceilings must be smooth, washable and sealed. Floors need drains, slopes and coatings that resist acid, caustic and thermal shock. Equipment pads, curbs and wall protection keep carts and forklifts from damaging finishes, and doors must close tightly against pests and dust.
We organize the building into zones: raw, cooked, packaging and shipping, with controlled access between them. Our manufacturing facility construction practice handles these layers, and the commercial concrete floors team places slabs sloped to drains with the proper joints and sealers.
Codes and Regulatory Layers
Food plants answer to several authorities at once. The building falls under the 2021 New Mexico Commercial Building Code, which adopts the 2021 International Building Code as amended, and the plumbing and mechanical codes are transitioning to their 2024 editions with permits issued under either through the end of 2026. Food safety authorities and the owner's customers add their own audits and standards on top.
We help owners coordinate these reviews. That means sharing drawings with the quality team early, documenting materials for finishes, and keeping records that support later inspections. We do not interpret food safety law for the owner, but we build the documentation trail so the owner's advisers can.
Wastewater, Odor and Neighbors
Processing water has a load. Dairy and cheese plants discharge whey and cleaning solutions, and nut and produce plants discharge solids and organics. Municipal systems in smaller towns may have limits, and a plant may need pretreatment or its own system. We bring a wastewater engineer into the discussion before the site is chosen.
Odor, truck noise and light also concern neighbors and the planning board. We consider building orientation, truck routes and landscape buffers as part of the plan, and we attend public meetings when the owner wants us to explain how construction will proceed.
Working Safely Around Food
Construction around food carries special risks: dust, debris and glass can contaminate product. We set up dust control, sealed temporary walls, and daily clean-up routines, and we log tools and materials entering sensitive areas. Workers wear the protective gear the plant requires and follow its rules about hygiene and access.
Chemical safety also matters. Ammonia refrigeration and sanitation chemicals require clear coordination. We schedule tie-ins during planned shutdowns and confirm with plant staff that lines are locked out and isolated before we begin.
How We Run a Food Project
We start with a conversation about the process rather than a drawing. The plant manager and the quality lead tell us how product flows and how it is cleaned, and then we build a plan that supports it. Early agreement on the hygienic zones and the finishes saves rework later.
For owners who store product in the building, a connected cold storage facility may be part of the project, and we coordinate that with the processing area so the temperature, the docks and the floors fit together.
Owners We Work With
Our food clients range from large dairy operators to small specialty producers. We build for food and beverage manufacturers who need a plant to grow with them, and for investors who want a flexible building that another food business could occupy later.
For smaller operations or support buildings, a pre-engineered metal building can handle packaging, dry storage or maintenance shops. We tell owners where we would use metal and where we would use a more durable system.
Talk Through Your Processing Facility
Tell us what you make, how it is cleaned and where the product goes next. We will review the site, the utilities and the hygiene requirements with you, and set out a plan that your quality team and your plant manager can both sign off on.
Questions Owners Ask
What floor finish is best for a food plant?
It depends on the process. Wet, hot or acidic areas need resin or urethane systems that tolerate those conditions, while dry areas can have sealed concrete. We review options with the owner's quality team and the manufacturer, and we choose finishes that can be repaired in sections.
Can you build a plant addition without stopping production?
Often yes. We build the new area behind temporary barriers, control dust and noise, and schedule the tie-in for a planned shutdown. The key is a clear plan with the plant manager well before work begins.
How do you handle wastewater planning?
We ask early about volumes and strength, then bring in an engineer to size pretreatment or storage. We also check with the local utility about discharge limits. Skipping this step can stall a project that is otherwise ready to build.
Do you coordinate with equipment suppliers?
We do. Equipment vendors send load, utility and layout requirements, and we update the structure and utility plans to match. We also hold vendor coordination meetings on large projects so pits, pads and openings are built in the right place.
What is a realistic schedule?
It depends on size, equipment lead times and approvals. We map the schedule from permits through startup and tell you which items are likely to govern. We do not promise a date before we have seen the equipment list and the site.