Project Planning
- Preconstruction budget and schedule review
- Permitting, inspections and owner reviews tracked to closeout
- Specialty trade partners scheduled, coordinated and supervised by our superintendent
- Closeout records, warranties and as-built drawings delivered with the building
A hospital never stops long enough to be built around, so everything we do in healthcare starts with how patients, staff and supplies keep moving while the work goes on. In New Mexico that question has a particular weight, because a community hospital may be the only full-service facility for a long drive in any direction. A construction barrier that closes a corridor for the wrong week is not an inconvenience there. It is a clinical problem, and we plan our work with the nurses and facility managers who will feel it.
We build hospital additions, surgical and imaging suites, emergency departments, behavioral health space, laboratories and the central plants that serve them. Many of these projects happen inside or beside operating buildings, which puts infection control, pressure relationships, vibration, noise, power continuity and life safety at the center of the plan. We listen to the owner's infection preventionist and facilities engineer first, because they know which risks the building can tolerate and which it cannot.
Healthcare owners also care about proof. They want documented inspections, commissioning records and a closeout package that satisfies their licensing and accrediting bodies. We build that documentation as the work goes, not at the end, and we share it in a format their staff can use.
Codes, licensing and healthcare review
Healthcare buildings in New Mexico are designed under the 2021 New Mexico Commercial Building Code (14.7.2 NMAC), which adopts the 2021 International Building Code as amended and took effect July 14, 2023. Hospitals fall into institutional occupancies, with stricter requirements for fire protection, smoke compartmentation and egress than ordinary commercial space. The mechanical and plumbing codes are changing too: the 2024 New Mexico Plumbing Code and Mechanical Code take effect August 1, 2026, with permits issued under either the 2021 or 2024 edition until January 1, 2027.
That overlap matters on healthcare jobs with long design periods. We confirm which edition the design team is using, make sure the permit submission reflects it, and track any change that might affect medical gas, ventilation rates or plumbing fixtures. Beyond the building codes, hospitals answer to health licensing authorities and accrediting bodies who inspect finished space, so we coordinate our own inspections with theirs and keep a clean paper trail.
Infection control and life safety while patients stay
An infection control risk assessment sets the rules for any work near patients. It tells us what kind of barrier to build, whether to maintain negative pressure in the work area, how to route workers, debris and materials, and which cleaning protocols must follow. We build sealed barriers with dedicated entrances, run HEPA-filtered air machines, monitor pressure and clean daily. We also train our field staff on the facility's own rules, because those vary from one hospital to the next.
Life safety is the companion. Exit paths, fire alarm and sprinkler systems must stay functional when we shut down an area or tie into an existing system, so we plan interim life safety measures with the facility's safety officer and the fire authority. Utility shutdowns for power, water, medical gas and ventilation are scheduled in advance, usually at night, with backup arrangements in place and a clear rollback plan if something fails to restart.
Working with clinical teams as partners
We treat the people who run the hospital as the owners of the schedule, because they are. Before work begins we walk the area with nurse managers, biomedical engineers, security staff and facilities leads, and we ask what they need us to avoid. That information shapes shift timing, material routes and noise limits. During construction we hold short regular check-ins instead of waiting for a problem to reach a formal meeting.
Good healthcare construction also depends on coordination between trades. Medical gas, nurse-call, low-voltage, electrical, mechanical and plumbing systems share the same ceiling spaces and walls, and a clash discovered in the field costs days. We use coordinated drawings, mockups of repeating rooms and early input from the commissioning agent to resolve those conflicts on paper. Our experience with phased construction on occupied sites informs the sequence for every healthcare job.
Hospitals and health networks across the state
Healthcare capital work in New Mexico runs from regional hospitals to the networks serving the largest cities. In Farmington, San Juan Regional Medical Center is a community-owned, non-profit 198-bed hospital and Level III trauma center with 165 private patient rooms. In Santa Fe, Christus St. Vincent Regional Medical Center completed a $44 million project in 2018 that added all-private patient rooms. Socorro General Hospital sits among that town's major employers, along with New Mexico Tech and the Bureau of Land Management.
These facts show the pattern of the work: private-room conversions, trauma-capable community hospitals and small-town institutions that serve very large geographies. We follow the needs of Farmington and the other health hubs, because each community has a different mix of services and a different willingness to take on construction disruption. A builder who understands the market can propose a phasing plan that fits the hospital's budget and its patient load.
Related work that supports a healthcare campus
Hospitals grow outward as well as inside. Next to a main building there is often a need for medical office construction, parking, and sometimes a separate building for imaging or outpatient surgery. Each of these has its own regulatory path and its own set of tenants, and we coordinate them so the campus functions as a whole rather than a series of disconnected projects.
Healthcare systems are also frequent clients for careful commissioning and closeout work, because their buildings need to prove that every system is working as designed before patients arrive. Our healthcare systems experience and our hospital building work reinforce one another, and we bring both to bear when a health system asks us to look at a long-range campus plan.
Planning shutdowns, long-lead equipment and opening dates
Healthcare schedules are controlled by equipment and by regulators. Imaging equipment, surgical lights, air handling units and emergency generators have long lead times and often require specific rough-in conditions, so we involve the owner's vendors early and confirm dimensions, power and structural needs before the walls close. We schedule regulatory inspections and equipment calibration as milestones, not afterthoughts.
Opening a new or renovated area is a staged event. Staff training, supply stocking, cleaning, final inspections and the move all take time, and we build them into the plan. We also plan the work so that interruptions to utilities and access are kept short and predictable. When a shutdown is required, the trade partners are ready with materials staged, a written procedure and a clear line to the facility's operations team, because the best shutdown is the one that finishes early.
Start a healthcare conversation with our team
Tell us about the building, the departments that must stay open and the date you need the space. We will start with the clinical and operational constraints and build the plan from there.
Questions Owners Ask
Can you build a hospital addition without disrupting patient care?
Usually, yes, though it takes planning. We separate the new work with sealed barriers, dedicated routes and negative-pressure zones when needed, and we schedule utility shutdowns during low-census hours. The facility's infection control and operations teams review the plan before we start, and we adjust as conditions change.
What codes apply to a hospital project permitted now?
The 2021 New Mexico Commercial Building Code governs the building, with the 2020 New Mexico Electrical Code and the 2021 Commercial Energy Conservation Code alongside it. The 2024 plumbing and mechanical codes become effective August 1, 2026, with either edition accepted for permits until January 1, 2027. We confirm the edition for each trade in the design team's submittal.
How do you handle the long lead time for medical equipment?
We ask the owner to identify major equipment early, obtain vendor drawings and confirm rough-in requirements. Then we sequence structural, electrical and mechanical work so the room is ready when the equipment arrives. Late equipment decisions are among the most common causes of delays, so we flag them in every schedule update.
Do you work on small rural hospitals and clinics?
Yes. Smaller facilities often have the same regulatory requirements with fewer staff and less flexibility, so planning matters even more. We discuss staffing, travel and the availability of local trades in the first meeting, and we price remote logistics honestly.
What documentation do you provide at closeout?
We provide as-built drawings, equipment manuals, testing and balancing reports, inspection records, infection control logs and commissioning documentation. We organize them by system so the facilities team can find what they need, and we keep copies for the warranty period.