Project Planning
- Preconstruction budget and schedule review
- Permitting, inspections and owner reviews tracked to closeout
- Specialty trade partners scheduled, coordinated and supervised by our superintendent
- Closeout records, warranties and as-built drawings delivered with the building
Processors in Portales need buildings that can be washed down daily, kept at a steady temperature and loaded from a dock that lines up with the trucks and the rail. A plant floor is a sanitary surface before it is anything else, and the way a slab is sloped, sealed and jointed decides whether the owner passes an inspection or fights mold for years. We build food and agricultural buildings with that in mind, and we have a lot of respect for the people who operate them.
The local economy gives us plenty to build around. The city is home to about 40 dairies and a major U.S. dairy solids plant, and it continues to be a major U.S. exporter of certified organic peanut products. Those industries need receiving areas, storage, processing rooms, cold rooms, maintenance shops and offices, and they need them within a schedule that follows the harvest and the milk truck, not the calendar of a developer.
A second client group is the university. Eastern New Mexico University has grown to become the third-largest university in the state, and campus work runs through the year. We plan for both kinds of owner, and we are comfortable talking with a plant manager in the morning and a facilities director in the afternoon.
Dairy, peanuts and the buildings behind them
Ready Roast Nut Company bought the Portales Peanut Plant in 2015, a 70-acre facility with a 53,000-square-foot peanut shelling facility, several large warehouses and storage for about 28 million pounds of farmer stock peanuts, and planned to create 200 new jobs over the next few years. A site like that shows what a peanut operation needs: a large footprint, heavy storage buildings, truck circulation and equipment rooms. We build and renovate comparable facilities for owners of any size.
Dairy-related buildings ask for different details, such as floor drains that actually drain, equipment pads, durable wall panels and reliable power. Our food and beverage processing work starts with the process flow and works outward, and our team coordinates with equipment suppliers so slabs, penetrations and utilities match their drawings. Owners in the manufacturing sector will find the same discipline in every phase.
Plants, warehouses and the yards around them
A typical Portales project begins with site work: grading, drainage, a compacted base and utilities sized for the load. We then pour foundations and floors, erect the structure, enclose and finish. For processing buildings we add sanitary details, such as coved bases, sealed floors and smooth wall surfaces that can be cleaned. For storage buildings we focus on clear height, door counts and a slab that carries loaded equipment.
Rail and highway access are part of the design. BNSF provides freight service in Portales, and US 70, NM 88 and NM 206 serve the city. We lay out truck courts, scale locations and any rail-adjacent paving so product moves in and out without conflict. When a site needs more than one mode, we coordinate with the railroad early, since its requirements can set the layout of the entire yard.
Building around harvest and the milk truck
An agricultural owner cannot pause operations because a contractor is behind. The schedule has to work around harvest, shipping seasons and the daily flow of product. We ask for the busiest periods in the first meeting and plan construction so critical connections, shutdowns and cutovers happen in the quieter weeks.
When an existing plant must keep running, we phase the work. A new bay is built first, equipment is moved in, and the old space is renovated afterward. Our approach to phased construction on occupied sites uses barriers, separate construction entrances and written coordination with plant staff so food safety is never compromised.
Food safety on a construction site
A construction site beside a food plant has a different set of rules from an ordinary job. We keep dust, debris and chemical products out of production areas, control access for construction workers, and wash or cover materials before they go near a clean zone. Trade crews follow the plant's own rules for hair, footwear and tools when they enter a processing area.
We also maintain ordinary jobsite safety: fall protection, trench protection, lockout and tagout coordination and traffic control for the trucks that move constantly through a processing yard. A daily briefing with the plant supervisor keeps both crews informed of who is where. We would rather lose ten minutes in the morning than create a risk for a worker or a product line.
Campus and public projects
Eastern New Mexico University announced in April 2025 that it had $11.483 million in capital outlay funding for ENMU-Portales for the 25-26 fiscal year, including $6.5 million to complete the new Student Academic Services building, $2.5 million for HVAC repairs to the Science Building and $408,000 for agriculture equipment in the new Animal Production facility. Money of that kind funds the repair and equipment-driven projects we handle well.
We build for education institutions and understand that a university project depends on approvals, state funding rules and the academic calendar. HVAC replacement in an occupied lab, for example, is a coordination exercise as much as a construction one. For related work in the area, owners also consult us about Clovis and Roswell, which share rail and agricultural markets with Portales.
Bring your Portales project to us
Tell us what the building has to produce, store or teach. We will review the site, the schedule and the approvals with you and offer a clear plan for getting it built. Use the contact form and we will arrange a visit.
Questions Owners Ask
Can you build a wash-down floor that will not fail?
Yes, with the right details. We slope the slab to drains, specify a sealed or coated surface suited to the cleaning chemicals, and design joints so they do not trap water. The owner's sanitation team reviews the details before concrete is placed. A good floor is the foundation of a clean plant.
How do you keep a plant running while we expand?
We build the new space first, then connect it during a planned shutdown, and renovate the old space last. Separate entrances, dust barriers and written coordination keep the process area clean. We schedule cutovers for slower periods so production is not interrupted during busy weeks.
What does rail service change about the building layout?
It shapes the dock position, the yard and the paving. The railroad has its own clearance and track standards, and those decide where the building can sit. We obtain them early and place the structure so trucks and rail cars do not conflict.
Is a university project different from a private one?
Somewhat. Public funding brings procurement rules, approval steps and reporting, and the campus calendar limits when noisy or disruptive work can occur. We build schedules around those limits and prepare documentation the institution expects at each stage.
How early should I call about a food processing expansion?
As soon as the process is defined. Equipment lead times, utility capacity and permits take the longest, and decisions about them affect the building layout. Early involvement lets us prepare a realistic budget and sequence before design is locked.