Project Planning
- Preconstruction budget and schedule review
- Permitting, inspections and owner reviews tracked to closeout
- Specialty trade partners scheduled, coordinated and supervised by our superintendent
- Closeout records, warranties and as-built drawings delivered with the building
Maintenance shops, equipment storage and light industrial space are the working buildings that keep a large installation and its suppliers running, and they are the buildings we put first around Kirtland Air Force Base. The base reported a $7.5 billion local economic contribution for fiscal year 2024, up by more than half from $4.88 billion two years earlier, and more than 20,000 military and civilian staff are based there. That volume of activity creates steady demand for space nearby.
Sandia National Laboratories is headquartered on the base, and the laboratories' campus here spans 8,699 acres in five technical areas, numbered TA-I to TA-V, with the Coyote Test Field in addition. Contractors, suppliers and research partners who serve that campus often need leased or owned buildings that are simple to operate, easy to reach and quick to deliver. A pre-engineered shell with a well-detailed slab often meets that need at a sensible price.
We also build for the community around the base, including churches, community centers and recreation buildings that serve the families who live and work there. Those projects share the same access and scheduling issues, and the lessons carry across.
A busy installation in the southeast part of the metro area
The base spreads over 51,558 acres in southeast Albuquerque at 5,355 feet above sea level, and the Albuquerque International Sunport uses the same airfield. Interstate 25 reaches it at Exit 222, Gibson Boulevard, near mile 224.09. For an owner siting a building, that mix of airfield, interstate and large employer means strong demand for flex space, vehicle service buildings and storage close to the gate.
It also means a lot of activity that a builder has to work around. We keep our mobilization plans simple, our deliveries scheduled and our neighbors informed, and we avoid staging materials where they could interfere with base traffic, shared roads or the flight line. Owners who plan a building here should expect the permitting and access conversation to be as important as the design.
Airfield proximity, soils and drainage
Buildings near an active airfield may face height review, lighting limits and construction crane restrictions, so we ask early which of these apply to a parcel. Cranes used for steel erection or tilt panel setting can require advance notice and coordination, and we build that lead time into the schedule instead of treating it as a surprise.
Ground conditions in the valley floor east of the river vary from firm native soil to loose fill. A geotechnical report guides footing design and slab preparation, and we plan stormwater so that runoff leaves the site in a controlled way. Sandy desert soils can drain well yet still erode around downspouts and pavement edges during heavy monsoon storms, so we detail splash pads, swales and curb openings with care.
Planning around gate access and security
Work on or next to a secured installation depends on who can enter, when and with what. Workers may need background screening, vehicles may need inspection, and delivery windows may be narrow. We collect those rules at the start and build a delivery calendar that respects them.
Long lead items such as overhead doors, electrical gear and steel are ordered early, so that a late delivery does not leave trade partners idle. We hold weekly coordination calls, publish a three-week look-ahead and flag any item that has slipped before it affects another trade. Owners who operate around the clock appreciate knowing when noise, dust or lane closures will occur.
Shop, storage and gathering buildings
The core of our work here is the flex light industrial building: an insulated shell with a mix of office and shop space, a few dock or grade-level doors and room for yard storage. We also build vehicle maintenance bays, covered storage and small fabrication shops, each sized to the equipment it will house. Clear height, floor loading, power and compressed air matter more than finishes in these buildings, so we settle them with the operator before the structural design is locked.
For the surrounding neighborhoods we build churches, community centers and recreation buildings, where acoustics, assembly occupancy and accessibility drive the design. Congregations and recreation boards often raise funds in stages, and we can phase a project so that a first portion opens while the rest is still being financed.
Permits and reviews
Projects on federal land follow the installation's own review process, while projects off the base follow city and county permit review. Either way, permitting and entitlements should be treated as a schedule item, not a formality. We assemble complete submittals, track comments and schedule inspections so that nothing waits on paperwork.
When a project involves hazardous materials storage, fire suppression or a change of occupancy, we confirm early which agencies must review it. The local building department reviews the permit, the fire marshal reviews life safety, and the design team answers comments, so we keep a log that shows each comment and its resolution.
How we run a project here
We listen first. Owners tell us how the building will be used, who will operate it and what must not be interrupted. Then we coordinate trade partners, supervise them in the field and inspect their work before the official inspector arrives.
We keep a single set of records for scope, changes and approvals, so that an owner or agency can audit the job at any time.
Who we build for
Owners near the base include defense suppliers, research partners and light manufacturers, and many fall under the heading of government and public sector work. Others are commercial landlords who lease small bays to tenants serving the installation.
Each group has a different decision process, and we adjust our proposals accordingly. A federal supplier may need a firm schedule tied to a contract milestone, while a landlord cares more about rent-ready dates and flexible bay sizes.
What we deliver
Our scope runs from preconstruction through closeout: budgeting, design coordination, site work, structure, envelope, interior finish and commissioning. For simple shells we often recommend pre-engineered metal buildings, which go up quickly and are easy to expand.
A close look at Albuquerque project needs, as well as nearby Corrales, helps us line up trade partners for the base area. Keeping a pool of qualified mechanical, electrical and concrete partners nearby shortens mobilization and lets us respond when an owner needs a quick change.
Plan your Kirtland area building with us
Share the use, the site and the date you need the building ready. We will review access rules and permits, then send a written plan with a schedule and budget range.
Questions Owners Ask
Can you build a shop next to an airfield?
Yes, but the parcel must be reviewed for height, lighting and crane limits. We check those early and plan erection methods that suit the restrictions. Most shop buildings are low and compact, which helps.
How do you handle work that needs security screening?
We learn the screening rules first and ask each trade partner to confirm their workers can meet them. Then we schedule deliveries and access so that screening does not slow the job. We keep a current list of approved workers.
Do you build churches and community centers as well?
Yes. These buildings need wide spans, good acoustics and careful accessibility planning. We coordinate the design team and trade partners, and we can phase construction if funding arrives in stages.
What is the fastest way to build a simple shop?
A pre-engineered metal building on a slab, with the foundation and utilities started while the steel package is being fabricated. This approach compresses the schedule, provided permits and soil reports are ready on time.