Project Planning
- Preconstruction budget and schedule review
- Permitting, inspections and owner reviews tracked to closeout
- Specialty trade partners scheduled, coordinated and supervised by our superintendent
- Closeout records, warranties and as-built drawings delivered with the building
In Santa Fe's designated historic districts, a 1957 ordinance requires new and rebuilt buildings to exhibit a Spanish Territorial or Pueblo style, which means a building has to look like it belongs before it is allowed to exist. Owners who arrive with a standard prototype and a standard schedule find out quickly that the review board is part of the team.
That is an unusually strict example, but the pattern holds everywhere in New Mexico. A project has to pass through zoning, site plan or design review, utility and drainage approvals, and finally the state's building permit process. Each step has its own people, its own calendar and its own idea of what a complete submittal looks like.
We work through those approvals alongside owners and design teams, and we do it patiently. A builder who treats the review board as an obstacle usually spends more time in review than one who treats it as a stakeholder, and a clear description of what we will build, how we will build it and how neighbors will be protected goes a long way. This page describes how permitting and entitlements shape a project and how we help.
Many jurisdictions, many rules
New Mexico has municipalities, counties, villages, tribal lands and a range of special districts, and their rules differ. In Edgewood, for example, after the town incorporated in 1999 large areas were annexed, producing a checkerboard of incorporated and unincorporated properties. A parcel that looks like one lot on the map may sit under one set of rules on one side and another set on the other, and that matters for utilities, road standards and which agency issues which permit.
Historic overlays add another layer. The La Mesilla Historic District, which includes Mesilla Plaza, was declared a National Historic Landmark in 1961, and work in and around it is shaped by that status. In places like Mesilla, Santa Fe and Edgewood, the first job is learning what applies to the particular lot.
The state code stack
Once local approvals are in hand, the building permit follows the state's adopted codes, administered by the Construction Industries Division of the Regulation and Licensing Department. The 2021 New Mexico Commercial Building Code, 14.7.2 NMAC, adopts the 2021 International Building Code as amended and took effect July 14, 2023. The 2020 New Mexico Electrical Code took effect March 28, 2023, and the 2021 Commercial Energy Conservation Code took effect January 30, 2024.
The plumbing and mechanical codes are changing next. The 2024 New Mexico Plumbing Code and 2024 Mechanical Code are listed as effective August 1, 2026, with permits issued under either the 2021 or 2024 edition until January 1, 2027 and only under 2024 after that. A project that straddles that date needs a decision about which edition to design to, and we raise the question during preconstruction.
Starting with the people who will decide
Before we submit anything we talk with the planning staff, the building official and, where it applies, the design review committee. We want to know their concerns in their own words. A pre-application meeting that costs an hour often saves a month, because it reveals what staff will ask for in the first comment letter.
We then assemble the submittal package so that it answers those concerns before they are raised: site plans, drainage report, utility letters, traffic information, elevations and a construction logistics plan. When comments come, we respond with specific revisions, not arguments. That approach builds trust, and a staff member who trusts a team gives straight answers faster.
Neighbors, boards and the public record
Public hearings are part of many entitlements, and the neighbors who attend are real stakeholders. A project that listens to concerns about traffic, noise, lighting or construction hours, and proposes concrete mitigation, usually moves through hearings more smoothly. We help owners prepare factual, plain-language presentations and we answer construction questions honestly.
Licensing is a related issue. Under 14.6.6 NMAC, the GB-98 General Building classification requires four years of foreman level experience, at least two of them commercial, and covers erecting, altering, repairing or demolishing residential and commercial buildings and certain structures. Owners should confirm that their contractor holds the right classification, and subcontractors should hold the matching ones for their scopes.
Putting approvals on the schedule honestly
Permitting time is the most uncertain duration on a project schedule, so we show it as a range and name what each phase depends on. Entitlements, if required, come first and can run months. Building permit review follows, and phased permits such as grading or foundation-only permits sometimes let work begin before the full set is approved, if the jurisdiction allows.
We schedule long-lead items and site work to match, so the owner does not pay for equipment or crews that are waiting on paper. This coordination is closely tied to long-lead procurement and to early site work such as mass grading, where a grading permit may be issued ahead of the building permit.
Owners we help through review
Different owners meet different hurdles. Commercial real estate developers are most concerned with entitlement risk and the carrying cost of land, so they need early information on what the zoning will allow. Public sector owners often have their own procurement and approval chain on top of building permits, which must be built into the schedule. Retail and hospitality owners with national prototypes need help adapting designs to local design review.
In each case, the work starts with a candid picture of what the approval path looks like, and the reasons the path may bend.
Where permitting connects to the rest of the work
Permitting decisions flow into design and cost. A conversation about design-build delivery often begins with the question of which approvals are on the critical path, and preconstruction estimating captures the cost of conditions that review may impose. Our municipal and government building work has similar concerns, with public review and procurement running side by side.
Start with the approval path
Tell us the parcel and the use, and we will map the approvals, the people and the likely timeline before you commit to a schedule.
Questions Owners Ask
Who issues building permits in New Mexico?
Local jurisdictions handle zoning and site plans, while the Construction Industries Division of the Regulation and Licensing Department administers the state building, electrical, plumbing and mechanical codes and issues permits in much of the state. Some municipalities have their own building departments for certain work. We confirm which agency has authority on each project at the outset.
Can construction start before every approval is final?
Sometimes. Jurisdictions may issue separate grading, foundation or early-package permits. Starting early carries risk if design changes later, so we discuss with the owner and design team what can safely begin.
What is the effect of the plumbing and mechanical code change?
The 2024 plumbing and mechanical codes are effective August 1, 2026, with permits allowed under either the 2021 or 2024 edition until January 1, 2027. A project permitted in that window can choose, and a project permitted later must use the 2024 edition. We raise this in preconstruction so the design team chooses with open eyes.
How do historic districts affect a commercial project?
They can regulate style, materials, massing, colors and signage, and they may require review by a board before a permit is issued. The review takes time and benefits from drawings that show how the building fits its context. We plan extra time and pay special attention to finishes such as stucco and masonry.
What if a parcel straddles two jurisdictions?
Then both sets of rules may apply to different parts of the project, and utilities may come from different providers. We help identify the boundaries early and meet with both agencies when needed.