Project Planning
- Preconstruction budget and schedule review
- Permitting, inspections and owner reviews tracked to closeout
- Specialty trade partners scheduled, coordinated and supervised by our superintendent
- Closeout records, warranties and as-built drawings delivered with the building
Drainage comes before drawings in Silver City, and any builder who reads the town's history understands why. On July 21, 1895, a heavy wall of water rushed through the downtown business district and cut a ditch about 55 feet below the original street level. Today the town sits at 5,919 feet, and every site plan we prepare here starts with where the water goes in a monsoon downpour.
We build commercial, institutional and renovation projects in Silver City, and the ones that last are the ones that respect the arroyos and streets around them. That means grading to keep runoff away from foundations, detention and swales sized for sudden flows, and paving that does not collect water at the doors.
Silver City is the Grant County seat and home to Western New Mexico University, so our work often involves education institutions as well as local businesses. We listen to the neighbors, the review boards and the people who will use the building before we settle on a plan.
Water, slopes and downtown streets
Any project near downtown or in a drainage path needs a drainage study and a plan for stormwater, and the town's own history is a reminder of what happens when it is ignored. We bring in a civil engineer early and design storm structures to the level the engineer prescribes, then verify them in the field after grading.
Slopes matter as much as flows. Foothill sites often mean retaining walls, stepped slabs and careful excavation near existing buildings. The stormwater and drainage trade partners build the inlets, channels and culverts that protect a new building.
Where a lot is tight, we also protect the neighbors: shoring excavations near property lines, controlling dust and mud, and restoring sidewalks and curbs when we are done. The quality of that cleanup is often what residents remember about a project.
Permits and review for Grant County projects
Commercial work is governed by the New Mexico Commercial Building Code, which adopts the 2021 International Building Code as amended and took effect July 14, 2023. We confirm the jurisdiction at the start, because town, county and state each have a role depending on the parcel, and we prepare submittals to match.
Projects in older parts of town may also face design review, and we treat the reviewers as project stakeholders rather than obstacles. A sketch of materials and a simple massing study often settles questions that would otherwise take several rounds of comments.
We also look at what the owner already has: surveys, soils reports, utility maps and prior approvals. A parcel with good documents saves weeks. A parcel without them gets a short due-diligence scope from us, so decisions about the building are made on information rather than hope.
Campus, civic and commercial buildings
Western New Mexico University has an 80-acre campus with more than 40 buildings and more than 3,500 students as of fall 2024. A campus like that generates education and school projects: classroom renovations, residence hall upgrades, labs and athletic facilities, often done between semesters.
Civic and commercial work follows the same logic. Clinics, offices, shops and restaurants on or near Hudson Street and US 180 need to be built without closing the neighbors. We schedule noisy work around business hours and keep sidewalks open.
Listening first in a small town
In a town this size, a good job gets noticed and so does a bad one. We hold a neighbor meeting before work that affects a street, we post a contact number on the fence, and we answer the phone. Neighbors who are informed rarely become opponents.
The same habit applies to the people who will use the building. A clinic manager, a department chair or a restaurant owner knows things about how a space works that no drawing shows, so we invite them to walk the plan with us before we order anything long-lead. Changes made on paper cost very little compared with changes made after drywall.
We also hire and buy locally where we can. State Road 90 (Hudson Street) leads southwest 45 miles to Lordsburg, and US 180 passes through the northern part of Silver City. Those routes bring supplies, but local trade partners know the ground and the inspectors, and we value.
Planning for remote supply
Silver City is not on an interstate, so materials arrive on two-lane highways from the east, south and west. We order early, consolidate loads and stage deliveries to avoid idle crews. For steel, glass and equipment we confirm lead times with suppliers and put them in the schedule.
Grant County Airport, a county-owned public use airport served by one commercial airline, is about 10 miles southeast of town. For owners who fly specialists in, that matters, and we coordinate site visits and inspections to make each trip count.
Mining-region work and related services
The Chino Mine, owned and operated by Freeport-McMoRan subsidiaries, is in Santa Rita, 15 miles east of Silver City, and the operations employed approximately 1,035 people as of January 2014. Mining supports shops, warehouses, offices and housing, and we build them with pre-engineered metal buildings and conventional framing.
When a mining or industrial client is a neighbor, we also adapt to its safety culture, access rules and schedule. The same discipline helps on campus and municipal projects, where scheduling around the academic year or a public meeting calendar matters just as much. The same crews serve Deming and Lordsburg share some of those needs.
Start your Silver City project
Tell us about the site, the building and the people who will use it. We will visit, talk through drainage and review requirements, and give you a plan with a schedule and budget range.
Questions Owners Ask
How do you protect a new building from flash flooding?
We start with a drainage study and design grading, swales and inlets around it. After the pad is graded we verify slopes and drain paths before the slab goes in. Finished floor elevations are set above the expected flow path, not just above the street.
Can you build during the university's academic year?
Yes, but we plan around it. Noisy and disruptive work, such as demolition and crane lifts, is scheduled for breaks, and quieter work continues during term. We coordinate with campus staff on utilities shutdowns and access.
How long do permits take in Silver City?
It depends on the project and the jurisdiction. Simple projects can move quickly, while those with drainage, design review or state requirements take longer. We prepare complete submittals and track each review, so questions are answered in days rather than weeks.
What does remote supply do to cost and schedule?
It adds freight and lead time, and it makes deliveries less flexible. We combine orders, ship to a staging area, and plan crew assignments around real delivery dates. Owners see these allowances in our estimates, along with the date each order must be placed to hold the schedule. A delivery that arrives early costs us a little storage; one that arrives late can cost a crew a week.