Project Planning

  • Preconstruction budget and schedule review
  • Permitting, inspections and owner reviews tracked to closeout
  • Specialty trade partners scheduled, coordinated and supervised by our superintendent
  • Closeout records, warranties and as-built drawings delivered with the building

Large campus work on open mesa ground rewards a builder who can mobilize early, run utilities and grading ahead of the vertical work, and stage steel and panels on a site with room to lay out. That is the Mesa del Sol type of job. The master plan calls for about 18,000,000 square feet of office space across a 9,000 acre development footprint, a scale that makes it a land-and-infrastructure project first and a set of buildings second.

We take the same view when we price it. A studio or flex building out there is only as good as the road base, the water and power connections, the stormwater plan and the phasing that lets the next pad get built while the first one is being occupied. We would rather tell an owner what the sitework is worth up front than let it show up as a change order in month four.

The South Mesa is dry, open ground, which suits tilt-wall and clear-span buildings, large paved areas and long delivery routes. It also means dust control, wind during crane picks and monsoon runoff need real planning, and that is why we plan the trade sequence carefully.

Studio, soundstage and production-support work

The City of Albuquerque announced on November 24, 2020 that Netflix's expansion of ABQ Studios at Mesa del Sol adds 300 acres, with $150 million in capital expenditures and 1,467 construction jobs. For a contractor, that tells us the campus is built in waves, with sound stages, workshops, back-lot paving and support offices all arriving over years rather than all at once.

Sound stages need tall, quiet shells with heavy mechanical systems, isolation from outside noise and wide truck access. We build these as pre-engineered metal buildings or tilt-wall volumes, pay close attention to the acoustic wall and roof assembly, and coordinate the electrical and HVAC trades so equipment rooms and distribution are set before finishes begin.

What a master plan means for the people building in it

Mesa del Sol is a master planned community on Albuquerque's South Mesa about six miles southeast of downtown, bordered by the Sunport, Kirtland Air Force Base, the Isleta Reservation and Interstate 25. That position puts airport cargo, defense contractors and film production in the same neighborhood, with a highway on the west edge that a delivery truck can reach in minutes.

The site is described as 12,900 acres, with 3,200 acres set aside for parks and open space. A developer here is therefore working inside a planned pattern of roads, lots and open land, which usually means design guidelines, covenant review and shared infrastructure. We read those documents with the owner before a design starts and build the review time into the schedule.

Site and concrete work we manage closely

Grading, base, stormwater and drainage and slab work are the activities that set the pace on a new pad, so we schedule and supervise them closely. On the mesa we place and compact in dry conditions, protect new subgrade from monsoon storms, and keep the haul roads in shape so concrete trucks and panel loads arrive on time.

For taller shells we cast the tilt-wall construction panels flat on the finished slab and lift them with a crane staged on the open ground. The open mesa gives us room to do that without the traffic restrictions of an infill site.

What owners ask us before they commit

Studio and production owners often add a fourth question about quiet. Rooftop equipment, truck courts and nearby aircraft traffic all affect how a stage building sounds on the inside, so we raise the acoustic assembly and mechanical placement during design rather than after the shell is up. Owners also ask about power: studios draw large temporary and permanent electrical loads, and a conversation with the utility early is the best way to protect the opening date.

Owners usually raise three questions early: how quickly can the first building be occupied, how much of the infrastructure is already in place, and how will later phases be built without disturbing tenants in the first. We answer each with a written phasing plan, a utilities map and a log of the responsibilities between us, the developer and the utility providers.

Because the campus is near the airport and the base, we also check height limits for cranes, lighting restrictions and construction access during preconstruction so none of them surprises the field team.

Keeping a large open site safe

A campus under construction has moving cranes, delivery trucks, concrete pumps and a good deal of visitor traffic at once. We lay out separate gates for deliveries and workers, fence the active work zones, and brief every subcontractor on the haul routes before they arrive. When tenants are already operating on the same campus we add separate pedestrian routes and morning coordination calls.

Open mesa ground also means heat in summer, wind in spring and sudden storms in monsoon season. Our site supervisors schedule hard physical work early in the day, plan crane lifts around wind limits, and keep hydration, shade and lightning procedures posted so crews work safely. Good habits on a big site are what keep the schedule intact when the weather turns.

Neighbors and companion services

A lot of Mesa del Sol owners are weighing sites against central Albuquerque locations or the west-side market in Rio Rancho, and we price each so the comparison is honest. Developers building a large phased site often combine this work with design-build delivery to speed up the early decisions.

Companies in the film and technology space may also find our work for commercial real estate developers relevant to how we organize multi-building campuses.

Plan a Mesa del Sol building with us

Bring us the parcel, the use and your target opening date. We will look at the covenants, utilities and site conditions and give you a phased plan you can take to your lender or tenant.

Questions Owners Ask

How big a site do I need for a stage or flex building at Mesa del Sol?

It depends on the building, the parking and the truck circulation. A flex building with dock-high doors usually needs space for trailer turning and a separate employee lot, and a sound stage adds production trucks and a back lot. We lay out a test-fit with a civil engineer before a purchase so you know what the lot can hold.

Who pays for roads and utilities on a master-planned site?

The answer is in the development agreement and the covenants, and it varies by parcel. We read those with you, price the on-site work, and clearly separate it from what the master developer or the utility is responsible for. That prevents mid-project disputes about who owns which trench.

Can construction go on while neighboring buildings are occupied?

Yes, and that is normal on a phased campus. We agree on haul routes, working hours, dust control and noise limits with the existing tenants, and we keep construction traffic away from visitor entries. If the buildings in front of you are production facilities, we also plan around shooting schedules.

How windy and dry is the work site, and does it affect the schedule?

The South Mesa is open ground, so wind affects crane lifts and panel placement, and dry conditions require dust control. During monsoon season, sudden storms can flood unprotected subgrade. We build weather days into the schedule and protect the pad as work proceeds.